Featured
A View From On High
February 15, 2019
Among the challenges of rejuvenating the nave of Trinity Church are the sheer size and height of the interior space in the 173-year-old Neo-Gothic structure. Construction team members figured out a way, through a complex structure of scaffolding, to inspect and repair the ceiling and the high windows and walls, and recently gave Trinity Vicar, the Rev. Phillip Jackson, a “high-level” tour.